Issue 7.0 UNIVERGE SV81004 - 88 Installing the SV8100 Blades3. Connect the cable from the NT1 Network Termination cable tothe CN7 or CN8 connector on the CD-2BRIA blade and/orPZ-2BRIA daughter board. (Refer to Figure 4-26 CD-2BRIABlade on page 4-86 for the location of the connectors on theblade.)5.4.3 LED IndicationsLED indications for the CD-2BRIA are listed in Table 4-48 CD-2BRIALED Indications. Each LED is listed with its associated function andLED and Operational status. Refer to Figure 4-26 CD-2BRIA Bladeon page 4-86 for the location of the LEDs on the blade. With normal operation, the status LEDflashes fast. If trouble was found duringthe self diagnostics routine, the status LEDflashes slow. Once connected, the PKG LED will not beindicated for the status of Layer 1 Link.Table 4-48 CD-2BRIA LED IndicationsLED IndicationOperation Status RemarksLive LED(Green)Busy LED(Red)On On System Initializing –Flash (1s) On The assignment of the unit is refused.When you exceed the systemcapacity.When the main softwareversion is not matched.Flash (1s) Trouble found during self-diagnostics. –Flash(100ms)OnNormalOperationA Channel is busy (useanother from CH1 ~ CHx).–Off All channels are idle. –OffOnUnit BusyA Channel is busy (useanother from CH1 ~ CHx).–Off All channels are idle. –Flash 80ms(On/Off) x 3/400mS offDownloading firmware. –