3ATTENTION: LIQUEFIED PETROLEUM (LP) PROPANEThe Trinity boiler is set to operate with Natural Gas, an LP Conversion Kit Part No. 82066-1 for Ti150 and 82650-1 forTi200 is included with each boiler and must be installed before operating with Propane.Liquefied Petroleum (LP) propane gas is heavier than air; it is imperative that your boiler is not installed in a pit orsimilar location that will permit heavier than air gas to collect. Local Codes may require appliances fueled with LP gasbe provided with an approved means, of removing unburned gases from the room. Check your local codes for thisrequirement.2.0 INSTALLATION REQUIREMENTSThe installation of your NY Thermal Trinity gas boiler must conform to the requirements of your localauthority, and the National Fuel Gas Code ANSI Z223.1 and or CAN/CGA B149 Installation Codes.Where required by the Authority, the installation must conform to the standard for “Controls and SafetyDevices for Automatically Fired Boilers ANSI/ASME CSD-1.Important: Carbon Monoxide DetectorsA carbon monoxide detector must also be installed in the room that houses the boiler. Carbonmonoxide detectors shall comply with NFPA 720 (2005 Edition).2.10 LOCATIONIn all cases, the Trinity boiler must be installed indoors, in a dry location, such that the gas componentsare protected from dripping or spraying water or rain, during operation and servicing. The boiler locationambient temperature is maintained to a minimum of 50°F.Determine the best location of the vent termination, and if possible locate the boiler as close to thetermination point as possible.Ensure that the desired boiler location is not subjected to flooding or high moisture levels, for damage tothe boiler will occur, voiding your NY THERMAL warranty.ClearancesFor proper and safe installation adhere to the following clearances to combustibles:Boiler Casing=0" Floor=Combustible Flue Pipe: Boxed in or enclosed=2” In free air=0”The following are the minimum clearances for servicing, however 24” is recommended:Front = 24” Back = 0" Top = 12" Sides = 12" Bottom = 12"“In the state of Massachusetts only”If there is not one already present, on each floor level where there are bedroom(s), a carbon monoxide detectorand alarm shall be placed in the living area outside the bedroom(s).If the bottom of the vent and air intake terminal is installed below four feet above grade, the carbon monoxidedetector located in the boiler room shall:a. Be powered by the same electrical circuit as the boiler such that only one service switch services both theappliance and the carbon monoxide detector;b. Have battery back-up power;c. Meet ANSI/UL 2034 Standards and comply with NFPA 720 (2005 Edition); andd. Have been approved and listed by a Nationally Recognized Testing Laboratory as recognized under 527CMR.