Page 32/62 GEO M6 HARDWARE SETUP PROCEDURE1 to 3 GEO (maximum) M6 truss or cable mounted8.3.5Required items- 1 x GMT-LBUMP- 1 x GMT-LBADPT- 1 x VNT-TCBRK (truss mounting) or 1 x VNT-XHBRK (cable mounting)- 3 x VXT-BL515 for first GEO M6- 4 x VXT-BL515 for second and third GEO M6IMPORTANTEnsure that suspension point is strong enough to hold GEO M6 cluster weight (35 kg)Procedure- Attach the GMT-LBADPT to the GMT-LBUMPER by using the screws, washers and bolts providedwith GMT-LBADAPT;- Connect top cabinet to GMT-LBUMP with 3 x VXT-BL515 quick release pins- Connect subsequent cabinets at required inter-angle values with 4 x VXT-BL515 quick release pins- Connect truss clamp VNT-TCBRK or ring clamp VNT-XHBRK to GMT-LBADAPT by inserting 8x45quick release pin in required holes for proper vertical aimingIMPORTANTEnsure that the 8mm pin is properly locked in GMT-LBADPT, and that 5mm pins areproperly locked into GEO M6- Lift and position assembly, lock and secure clamp on rigging point.