Options 10-5Part 1602966−05 2015 Nordson CorporationInstallationWARNING: Allow only qualified personnel to perform the following tasks.Follow the safety instructions in this document and all other relateddocumentation.WARNING: Turn off and lock out system electrical power before performingthe following tasks. Failure to observe this warning may result in personalinjury or equipment damage.NOTE: Inspect all Vibrasonic system components for cleanliness anddamage. Contact your Nordson representative if any components aredamaged.Vibrasonic Transducer and Sieve Screen Installation1. See Figure 10-3. Clean the sieve screen’s (7) center hub and the bottomof the transducer (6) with acetone.NOTE: The transducer must be secured to the flat side of the sievescreen hub.2. Place the transducer on the center hub of the sieve screen. Handtighten the cap screw (8) through the bottom of the sieve screen.3. Hold the base of the transducer with the supplied pin wrench and turnthe cap screw with the supplied torque wrench until you hear a click.4. Install the U-gasket (11) and ground clip (12) on the screen.5. Set the sieve screen into the vibratory sieve (9). Plug the transducercable (4) into the transducer, route the cable through the sieve deck (5),then clamp the sieve deck onto the sieve pan.6. Slide the transducer cable through the slit in the plug (10), then installthe plug into the sieve deck.Controller and Cable Installation1. See Figure 10-3. Make sure that the voltage selector on the controller(1) is set to your system’s electrical supply specification.2. Mount the controller above the powder feed center electrical panel asshown in Figure 2-8.3. Connect the control cable (2) to the controller. Route the other end tothe feed center roof.4. Mount the bulkhead connector (3) in the feed center roof, then route thetransducer cable (4) to the bulkhead connector and plug it in.