26 Chapter 3 Preinstallation requirementsUnpacking the 703t serverIntroductionFollow this procedure to unpack the server and peripherals.WARNINGRisk of personal injuryThe 703t CallPilot server weighs approximately 22 kg (46 lb) asshipped from manufacturing. If necessary, and to prevent personalinjury, ask someone to help you unpack and position the server.To unpack the equipmentATTENTIONAs you unpack each item, check it off against the packing list, as well as againstthe following checklists provided in the Installation and Configuration Task List(NN44200-306):• "CallPilot software media and documentation checklist"• "CallPilot server hardware checklist"Step Action1 Carefully open the cardboard carton containing the server.2 Remove the server from the carton and set it on the floor.3 Carefully open the cartons containing the monitor, keyboard, mouse,modem, and ELAN hub (if supplied), and set the peripherals aside.4 Put all manuals, CD-ROMs, operating system disks, and any disksfor peripherals in a safe place.5 Save all packing materials and cartons in case you must return anyequipment to the carrier.—End—What is next?Remove the server cover so that you can inspect the interior of the server.See "Removing the side cover" (page 26).Removing the side coverIntroductionThis section describes how to remove the server’s side cover so that youcan work with the interior components. The side cover is on the server’s leftside when the front of the server is facing you.Nortel CallPilot703t Server Hardware InstallationNN44200-304 01.01 Standard5.0 23 February 2007Copyright © 2007, Nortel Networks Nortel Networks Confidential.