Page 9 of 86Meridian data features Operations and tests60Operation procedures and testsContent listThe following are the topics in this section:• Reference list 9• Prerequisites 9• Testing procedures 10• Operating procedures 12• Hot Line calls 26• Keyboard dialing 28• Keyboard dialing from the AIM data station 33• Keyboard dialing from the ASIM data station 42• Keypad dialing from the ASIM data station 54Reference listThe following are the references in this section:• X11 Features and Services (553-3001-306)PrerequisitesEnsure that commercial power is supplied at the appropriate outlets. Be surethe power modules required for any SL-1 set Add-on Data Module—forexample, the QMT—equipped at Meridian data station are installedaccording to instructions.Designate or install a test station to have access to external data testequipment before testing the Meridian data station or stand-alone ADM.