NWB & NWB-HC IM28 OCT 2014 Page 19Instruction Manual NWB & NWB-HC IM 28 OCT 2014110.0 DRYING MATERIALNOTE: Assure voltage, connection and phasing are correct, cooling wateris supplied (for dying over 225°F) and thermocouple is inserted in hopper.Connect material source to Hopper Receiver.Turn Main Disconnect Switch to “ON” position and Quick Opscreen (below) will appear.Check the Time pre-sets. See page 16 of manual if they are not correct.It is important that alarms have correct date & time stamp.Press the RESIN NAME button on the hopper icon to access the resin menu.Level 1 operator can choose one of the pre-set resins and press RUN to enter thosevalues in the Quick Op screen. Level 2 or higher can press the resin name and/or dryingtemperature and enter new values in the resin memory. The same numeric oralpha/numeric screens will appear for your entries. Press the BACK button to return tothe Quick Op screen.After the Drying Hopper is at least 1/2 full of resin, you can start the Process heater.Press Green “ON” switch to start the Process Heater.It usually takes 2-4 hours for first hopper load of material to be sufficiently dry forprocessing.Note that Process Heater can be turned OFF or ON by a Level 2 or higher personusing the button in the center of the Quick Op screen.Pressing MENU on the Quick Op screen will allow viewing of the ADVANCEDFUNCTIONS screenvv44v2v33