Consolidating Data from NetWare Servers 45• Show where a folder or object went: Select the object in the left pane, then click Edit > WhereDid It Go. The directory or volume that was moved is highlighted in its new location in theright pane.• Show where a folder or object came from: Select the object in the right pane, then click Edit >Where Did It Come From. The directory or volume that it came from is highlighted in the leftpane.• Show all folders or objects selected for copying: Select a container in the left pane, then clickEdit > Show Dropped Folders (or Show Dropped Printers).TIP: The previous six tasks can also be performed by right-clicking the object to see the samemenu option.• View the available disk space before performing the verification by right-clicking thedestination volume in the right pane of the Project Window and then selecting Properties.Right-clicking the source folder or volume in the left pane of the Project Window and thenselecting Properties displays the size of the source object.6.5 Perform Pre-Copy VerificationsAfter you have dragged-and-dropped the selected directories or volumes and have performed anyother modeling tasks, proceed by clicking Project > Verify and Copy Data or by clicking Do theConsolidation on the button bar.NOTE: These instructions assume you have not enabled server-based processing. If you have, referto the additional information in Section 6.12, “Server-Based Processing,” on page 60.Begin the Verification1 When the Verification Wizard dialog box displays, click Next to begin the verification process.2 The Dropped Folders dialog box displays, showing the source path and destination path for thedropped folders. Do one of the following:• If the source and destination paths are correct, click Next.• If the source or destination path is incorrect, click Cancel and make the appropriatechanges in the Project window.3 (Conditional) If you created new folders in the right pane of the Project window as part of yourconsolidation project, the Created Folders dialog box now displays. Do one of the following:• If the destination path of the created folders is correct, click Next.• If the destination path is not correct, click Cancel and make the appropriate changes in theProject window.4 (Conditional) If you are moving NDPS® printers as part of your consolidation project, theDropped Printers dialog box now displays. Do one of the following:• If the destination locations of the printers are correct, click Next.• If the destination locations are not correct, click Cancel and make the appropriate changesin the Project window.