AUTO SWITCH OPERATIONThe below operations will be performed by pressing the“AUTO” switch.1. AUTO OPERATION MODEThe Auto operation will be activated immediately once theAuto Switch is pressed.2. TEST RUN OPERATION (FOR PUMP DOWN/SERVICINGPURPOSE)The Test Run operation will be activated if the Auto Switchis pressed continuously for more than 5 sec. to below 10sec.. A “pep” sound will occur at the fifth sec., in order toidentify the starting of Test Run operation3. HEATING CONTROLLER RECEIVING SOUND ON/OFFThe ON/OFF of remote controller receiving sound can bechanged over by following steps:4. REMOTE CONTROLLER RECEIVING SOUND ON/OFFThe ON/OFF of remote controller receiving sound can bechanged over by following steps:a. Press “AUTO” switch continuously for more than 16 sec.to below 21 sec. A “pep” “pep” sound will occur atsixteenth sec..b. Press the “Check” button once at remote controller. A“pep” sound will occur.c. Press the “AUTO” switch once to select remotecontroller receiving sound ON/OFF. A “pep” soundindicates receiving sound ON, and a “pep” soundindicates receiving sound OFF.11.3. OUTDOOR UNIT11.3.1. SELECT THE BEST LOCATION(Refer to “Select the best location”section)11.3.2. INSTALL THE OUTDOOR UNIT• After selecting the best location, start installation accordingto Indoor/Outdoor Unit Installation Diagram.1. Fix the unit on concrete or rigid frame firmly and horizontallyby bolt nut. (ø10 mm).2. When installing at roof, please consider strong wind andearthquake. Please fasten the installation stand firmly withbolt or nails.11.3.3. CONNECTING THE PIPINGConnecting The Piping To Indoor UnitPlease make flare after inserting flare nut (locate at joint portionof tube assembly) onto the copper pipe. (In case of using longpiping)Connect the piping• Align the center of piping and sufficiently tighten the flarenut with fingers.• Further tighten the flare nut with torque wrench in specifiedtorque as stated in the table.MODEL Piping size (Torque)Gas LiquidE9CK 3/8” (42 N.m) 1/4” (18 N.m)E12CK 1/2” (55 N.m) 1/4” (18 N.m)Connecting The Piping To Outdoor UnitDecide piping length and then cut by using pipe cutter. Removeburrs from cut edge. Make flare after inserting the flare nut(located at valve) onto the copper pipe.Align center of piping to valves and then tighten with torquewrench to the specified torque as stated in the table.63CS-E9CKP CU-E9CKP5 / CS-E12CKP CU-E12CKP5Panasonic ilmalämpöpumput korjaa ja huoltaa pääkaupunkiseudulla: Jäähdytinpalvelu RefGroup Oywww.ilmalämpöpumput.com