43TD-001578-01-AMenu – SchedulingThe Scheduling screen is used to set up scheduled recallof scenes. Each scheduled recall is known as an Event.This function is also supported in MP Manage if enabledby the installer.NOTE!: Scheduling depends on the internalclock of the MP-M being set to the correcttime. If the MP-M is connected to theInternet, its internal clock will be automaticallyupdated. If it is not connected to the Internet,the clock may be set to match the time of aconnected device from the settings screen.1. New Event button – Touch this button to create a newscheduled event.Left Side of Screen2. Event List – Displays a scrollable list of events3. Event Name – The user-defi ned event name4. Start – Frequency and start time of the event5. Active – Green is active, red is inactiveRight Side of Screen6. Event Name fi eld – Touch to enter a name for theevent.7. Active switch – Activates or deactivates the eventwithout changing any of the event settings.8. Start Date button – Displays a pop-up to set the datewhen the event is to occur for the first time.9. Start Time button – Displays a pop-up to set the timeof day the event is to occur.10. Load Scene button – Displays a pop-up with a list ofavailable scenes.11. End Date button – Displays a pop-up to set the dateon which the event will no longer occur.12. Repeat button – Displays a pop-up to select when theevent repeats. Options are:a. No Repeat – one-time eventb. Daily – seven days per weekc. eekdays – Monday – Fridayd. eekly – one time per week beginning on theStart Datee. eekends – Saturday and Sunday only13. Delete button – Deletes the selected Event.TouchMenuTouchScheduling3 411096811512271310981211