19Quadra-Fire • Expression 36 (QV36A-FB) • 2062-900 Rev. S • 11/11C. Vertical Penetration FramingInstalling the Ceiling Firestop• Frame an opening 10 inches by 10 incheswhenever the vent system penetrates aceiling/floor (see Figure 6.3).• Frame the area with the same sizedlumber as used in ceiling/floor joist.• When installing a top vent verticaltermination appliance the hole should bedirectly above the appliance, unless theflue is offset.• Do not pack insulation around the vent.Insulation must be kept away from thepipe.Figure 6.3ATTIC ABOVE10 IN. (254 MM)HOLE SHOULD MEASURE10 IN. X 10 IN.(254 MM X 254 MM)INSIDE TO INSIDE10 IN.(254 MM)Installing Attic ShieldNote: An additional ceiling firestop is notrequired if attic shield is used.• Frame opening for attic shield.• Attic shield may be installed above orbelow ceiling (see Figure 6.4).• Secure with three fasteners on eachside.• Fold tabs at top of attic shield in towardvent pipe. Tabs must keep vent pipecentered within shield.• Field construct additional shield height ifinsulation is deeper than height of atticshield.Figure 6.4 Installing the Attic Shield3 FASTENERSPER SIDEBEND TABS INAROUND PIPEATTIC SHIELD INSTALLEDBELOW CEILINGATTIC SHIELD INSTALLEDABOVE CEILINGFire HazardKeep loose materials or blowninsulation from touching thevent pipe.• National building codes recommendusing attic shield to keep loose materials/blown insulation from contacting vent.• Hearth & Home Technologies requiresthe use of an attic shield.WARNING