May 23, 2013 7075-166CPage 23VOYAGEUR GRAND Wood InsertRFigure 23.1F. Baffle & Ceramic Blanket Removal1. Remove all ash from the firebox, and extinguish all hotembers before disposal into a metal container.2. It is easier to remove both baffle boards and ceramicblanket after the tube channel assembly has been partiallydisassembled and the right side lowered. Follow steps1 through 4 on page 25 for removal of the tube channelassembly. It is not necessary to completely remove thetube channel assembly.3. Once the baffle protection cover has been removed, pullthe baffle boards and ceramic blanket forward about 1 inch(25mm) and then overlap the baffles about 1-2 inches (25-51mm). Figure 23.2.4. Slide the tube channel assembly to the left as far as it willgo and lower the right side. Remove the baffle boards andceramic blanket together. Figure 23.3.4. Re-install in reverse order. Be sure the baffle boards andceramic blanket are in their proper positions. See Figure11 .1 on page 11.E. Door Handle Assembly1. Install washer on door handle shaft.2. Slide door handle through door.3. Install additional washer(s) as shown in Figure 23.1.4. Install key in groove.5. Align groove in latch cam with key; slide latch cam overshaft6. Install locknut but do not overtighten, the handle needsto move smoothly.7. Install handle turning in a counter-clockwise motion todesired location on door handle rod. Figure 23.1.CAUTION! Do not overtighten lock nut. The door handleneeds to move smoothly.LocknutLatch CamSpacingWashersDoor CrossSectionSquare KeyDoor Handle ShaftFiber HandleFigure 23.2Figure 23.3Slide Tube Channel to theLeft and Lower Right SideBaffle Boards OverlappingCeramic Blanket