8RAMSETwww.ramsetinc.comRAM 100 • 1000 • 5500GATE6”8 5/8”13 1/4”BASEOPERATORconcrete18”concrete18”24”TAIL4 1/2”3” MIN4”TOP vIEWGATE ShOWN CLOSEDLh FRONT INSTALLATIONCLMark centers andinstall four 1/2-13UNC Red-headAnchor BoltsWallTOP VIEWGATESHOWN OPENLH FRONTINSTALLATIONGATEFigure 6Figure 7Figure 8CONCRETE PAD CONSTRUCTIONDimensions given for the pad are based on soil bear-ing shear of 2000 P.S.F. These figures may have tobe adjusted depending on local soil conditions.1. Construct form for mounting pad according todimensions shown in Figure 6, 7 and 8.2. Locate mounting pad according to dimensionsgiven in illustration.3. Level top edge of form.4. Set reinforcing bars and wire mesh.5. Mix concrete, pour mixture into form. Level andfinish surface after pouring is complete.6. Allow pad to cure for 48 hours, and remove forms.All Sliding Gate Operators are factory presetfor (LH) Left Hand Installations.RAM 1000/ RAM 5500 INSTALLATION SPECIFICATIONSWARNING Do not exceed the specifications. The warranty on your unit will be void if theinstallation exceeds the recommended specifications.