Instructions for Assembling Field Pipe Vise1114-50312Instructions for Assembling the FPV201. Cut four pieces of 11/ 2" (48 mm) diameter pipe, each 40"(1015 mm) long for the legs and one piece 6 feet (1.83 m) long forthe backbone.2. Slip the Chain Vise base (center section) on to the backbone,clamping it on the pipe about 15" (380 mm) from one end bytightening the two bolts.3. Next, slip a leg frame over each end of the backbone with the"window" in each leg socket facing outward. Lay the backboneon the floor upside down, resting the V's and put a pipe leg ineach socket.4. Make sure that each pipe leg bottoms in the socket (see window).Tighten the threaded knob or bolt in each leg frame toclamp the entire assembly together. It is helpful toassemble this vise upside down with the V's resting onthe floor; the two leg frames and the pipe clamp thenCapacity 2" - 20" (50 - 500 mm)Fig. 1Cat. No. FPV20Item Code #06027automatically line up, Fig. 1.NOTES:• If the leg angles need a little adjustment once the vise isupright, slightly loosen the knob (or bolt) and gently lift the backbonejust a bit. Adjust the legs and retighten the knob (or bolt.)• Both legs must “bottom” in their sockets or the assembly will not be solid.• 2,000 pound (900 kg) capacity.