Over-squeezeprOtectiOnstOpsADDLecLAMpsPES6H Operating InstructionsPhone: 800-666-3691 or 814-452-3691Fax: 800-456-1697 or 814-455-1697www.reedmfgco.comReed Manufacturing Company1425 West 8th StreetErie, PA 16502 USASafety Considerationspressure control situations requiring squeeze-off may involve working in thevicinity of escaping gas. consider the possibility and potential hazard of staticelectricity and observe safety precautions. safety precautions regarding staticelectricity generally include performing squeeze-off in a separate bellholeremote from the blowing gas; applying a wet rag/tape to the pipe surface; andspraying the area with a fine water mist to conduct the static charge to theground; grounding the squeeze-off tool. check the squeeze-off tool prior to useto assure it is the correct size; is properly functioning; and is properly adjustedfor the squeeze-off to be done.Prior To UseGas service: connect reed’s #04619 Grounding Accessory and #04620 staticDischarge Alarm.*Reed strongly recommends use of the PEGR Grounding Accessory (#04619) with PE Squeeze-OffTools. Use a grounding accessory as a precaution against static build-up. Dissipate the charge andminimize the possibility of ignition.Additional information on static electricity is available in the A.G.A. Plastic Pipe Manual forGas Service, Copyright 2006.polyethylene squeeze-Off tool - 6" Hydrauliccapacity: 3" - 6"1210 #54311cat. no. pes6H item code: #04312puMpreservOirvALvetie rOD enDOver-squeezeprOtectiOnstOpsADDLecLAMpsPES6H Operating InstructionsPhone: 800-666-3691 or 814-452-3691Fax: 800-456-1697 or 814-455-1697www.reedmfgco.comReed Manufacturing Company1425 West 8th StreetErie, PA 16502 USASafety Considerationspressure control situations requiring squeeze-off may involve working in thevicinity of escaping gas. consider the possibility and potential hazard of staticelectricity and observe safety precautions. safety precautions regarding staticelectricity generally include performing squeeze-off in a separate bellholeremote from the blowing gas; applying a wet rag/tape to the pipe surface; andspraying the area with a fine water mist to conduct the static charge to theground; grounding the squeeze-off tool. check the squeeze-off tool prior to useto assure it is the correct size; is properly functioning; and is properly adjustedfor the squeeze-off to be done.Prior To UseGas service: connect reed’s #04619 Grounding Accessory and #04620 staticDischarge Alarm.*Reed strongly recommends use of the PEGR Grounding Accessory (#04619) with PE Squeeze-OffTools. Use a grounding accessory as a precaution against static build-up. Dissipate the charge andminimize the possibility of ignition.Additional information on static electricity is available in the A.G.A. Plastic Pipe Manual forGas Service, Copyright 2006.polyethylene squeeze-Off tool - 6" Hydrauliccapacity: 3" - 6"1210 #54311cat. no. pes6H item code: #04312puMpreservOirvALvetie rOD enD