8flinstallationMINIMUM CLEARANCE TOCOMBUSTIBLE MATERIALSUniversalDefault (1)AHDSpecial (2)A 475mm 475mm*B 160mm 160mmC 175mm 175mmD 160mm 160mmE 78mm 78mmF 300mm 300mmG 875mm 875mmH 969mm 969mmFloor ProtectionA combustible floor must be protected by non-combustible material (liketile, concrete board, or as defined by local codes) extending beneaththe heater as follows;From Sides: Dimension (E)From Front: Dimension (F)From Back Shield: Dimension (D)The floor protector should consist of 12mm thick cement fibre sheetwhich has a thermal resistance of 0.8m 2 k/w for 4mm sheets of cementfibre sheet.The flue pipe shall extend not less than 4.6m above the top of the floor protector.NOTE: Installation must be carried out by a licensed installer in accordancewith AS/NZS 2918:2001.IMPORTANT* (1) The Universal Default flue kit requires one 130o x 900mmstainless reflective shield; fitted to the rear of the active flue.* (2) The AHD Special Insulated flue kit must be installed with a40mm air gap around the flue to any combustible surfaces and theceiling ring must be spaced as such to provide an air gap of 20mmto the ceiling.A 130º x 900mm stainless reflective must be fitted behind the activeflue.* Wall clearance taken from rear shield (not fan).NOTE: A minimum clearance of 160mm (flat wall) or 175mm (corner wall) must be retained for all wall surfaces to allow for fan access and maintenance.