R5 SOLID AIS SystemINSTALLATION7000 118-200, C2 Page 123.2 Installation CablesThe following cables are needed to install the R5 SOLID.R5 Signal Cable, DSUB-OpenType: Shielded Twisted Pair x 0.33 mm2Length: 2 mConnector: 26-pole H.D.D-SUB (female)Marking: 7000 118-078, AR5 Power CableType: Unshielded 4 wire cable x 1.3 mm2Length: 2 mConnector: ConXall Mini-Con-X 6382-4SG-311 (female)Marking: 7000 118-077, AR5 SOLID VHF Antenna CableType and length: See section 3.5.2 VHF CablingConnector: BNC (Male)R5 SOLID GPS Antenna CableThe standard GPS antenna MA-700 for the R5 SOLID transponder system isprewired with an antenna cable. For other GPS antennas an extern GPSantenna cable is needed.Type and Length: See section 3.6.2 GPS CablingConnector: TNC (Male)3.3 Installation procedureWhen installing the R5 SOLID, it is recommended to follow the steps described in thisInstallation Manual. Details of the installation procedure can be found in the comingsections of the Installation Manual.Recommended installation steps:1. Mount the R5 SOLID at conning station2. Mount the alarm relay unit3. Mount the VHF antenna4. Mount the GPS antenna5. Connect all external systems and sensors to the R5 SOLID6. Power up the system7. Set configuration parameters8. Perform system functional check