OfficeServ 7200 INSTALLATIONTECHNICAL MANUAL PART 1 MAY 20107 CONNECTING STATIONS AND ADDITIONAL EQUIPMENT7.1 CONNECTING STATIONS .................................................................................... 7.17.2 CONNECTING ADDITIONAL EQUIPMENT ................................................... 7.338 POWER UP PROCEDURES8.1 PRE-CHECK .............................................................................................................. 8.18.2 STARTING THE SYSTEM ....................................................................................... 8.18.3 CHECKING THE FAN ............................................................................................. 8.38.4 NUMBERING EXTENSIONS AND C.O. LINES .................................................. 8.39 SOFTWARE AND DATABASE MANAGEMENT9.1 SOFTWARE MANAGEMENT on MCP and MP20 .......................................... 9.19.2 DATABASE MANAGEMENT ................................................................................ 9.110 ADDING CARDS TO THE SYSTEM10.1 ADDING STATIONS AND TRUNKS................................................................. 10.1FIGURESFigure 2.1 Tools Required for Rack InstallationFigure 2.2 Rack Installation (1)Figure 2.3 Rack Installation (2)Figure 2.4 Rack Installation (3)Figure 2.5 Rack Installation (4)Figure 2.6 Tools Required for Wall InstallationFigure 2.7 Wall Installation (1)Figure 2.8 Wall Installation (2)Figure 2.9 Wall Installation (3)Figure 2.10 Wall Installation (4)Figure 2.11 Wall Installation (5)Figure 2.12 Wall Installation (6)Figure 2.13 GroundingFigure 3.1 Front Panel ConfigurationFigure 3.2 Back Panel ComponentsFigure 3.3a MCP Switch SettingsFigure 3.3b MP20 Switch SettingsFigure 3.4 Installing the Processor Board (1)Figure 3.5 Installing the Processor Board (2)Figure 3.6 Link Cables