RY9 Washer Heater Relay1 Heater (Red)2 (N) (Wht)CN91 Motor Pwr U Phase (Blu)2 Motor Pwr V Phase (Wht)3 Motor Pwr W Phase (Red)CN101 Main Valve (Blu)2 Hot Valve (Red)3 Pre Cold Valve (Yel)4 Bleach Valve (Pnk)6 Drain Pump (Blk)7 Door Lock Close (Sky)8 Door Lock Open (Wht)CN8 (Hull Sensor)1 +5 vdc (Pnk)2 Sensor Signal (Red)3 Sensor Signal (Blu)4 Ground (Org)CN71 Silver Care (Wht)2 Door Lock & Valve common (to L)(Blk)CN51 AC Pwr (N) (Wht)3 AC Pwr (L) (Blu)CN33 Water Temp Thermistor(Wht)4 Door Sw (Brn)6 Water Temp Thermistor Gnd. (Org)7 Water Level Sensor (Vio)8 Water Level Sensor (Pnk)CN1 & CN2PCB Sub (Display)CN4 AG PCB1 (Red)2 (Blu)3 (Wht)4 (Grn)5 (Pnk) GroundWater Temperature Thermistor Check Test 1 Test 2Connector CN 3 Pin 3 (White) and CN3 Pin 6(Orange)Operating voltage at Room temperature-Operating Resistance at RoomTemperature (Power off) discon-nect CN32.5VDC (5VDC May indicate a connectorissue)12kΩ-14kΩDoor Switch Check Test 1 Test 2Connector CN3 pins #6(Org) & # 4(Brn) 5VDC Door Open, 0VDC Door Closed Operating Resistance withpower offopen with door open, short withdoor closed.Water Level Sensor Check Test 1 Test 2Voltage: Connector CN 3 pins #6(Org) & # 7(Vio)And Connector CN 3 Pins #6(Org) & #8(Pnk)Resistance: Connector CN 3 Pin 8 (Pink) and CN7Pin 7 (Violet)Operating voltage at no water in thedrum-Operating Resistance (Poweroff)2.5VDC CN3 Pin 8 (Pink) and Pin 7(Violet) 22- 24ΩHall Sensor Check Test 1 Test 2Connector CN8 pins #4(Org) & # 2(Red) additionally4(Org) & # 3(Blu)Manually spin the drum to see the volt-age change, Power OnN/A0Vdc or 3.75VdcMotor Check Test 1 Test 2Connector CN9 Pin 1 (Blue), Pin 2 (White) and Pin3 (Red)Power Off 11.5Ω across Pins 1-2, Pins 1-3, & Pins 2-3N/AA/C Power Check Test 1 Test 2Connector CN 5 Pins 1 (White) and 3 (Blue) Power On 120VAC N/ACN11 (MEMS PCB)1 (Blu)2 (Wht)3 (Yel)4 (Org)5 (Pnk)3