Practice in Standing PosturePractice in Sitting PostureDistance from the end of thebase to the wall surface orfurniture:Practice in Standing PosturePractice in Sitting PostureCOMFORT/AXIS/LITEor overPRIMOor overincluding an aisle of 500 mm(from handrail to wall surface)Drainage CenterProduct CenterProcedures for Installing the Pipe GasketWater Supply Hot Water Supply DrainageRise Dimensions of PipeUse waterproof flooring materials.If the floor has an opening, cover the opening when completing the interior finishing (waterproofing).Install all pipe gaskets.DrainageRise: 100Hot Water SupplyRise: 60Water SupplyRise: 60- Wooden floor: Veneer board with 30 mm thickness or more- Mortar floor: Mortar thickness of 50 mm or more- Special floor (stone, etc.): The base for which theabove-stated strength is ensured should be formed in theinstallation area.Show the floor installation surface.2~5㎜Pipe Gasket (Sponge Side)Make a cut. Install the pipegasket.Be sure to caulkthe pipe.An aisleor overThe wall surface or furniturethe wall surface or furnitureUnit fixing position and Plumbing Layout26(1) Set the dedicated paper template on the floor by aligning it with therise points for the water, hot water, and drainage pipes.(2) Mark the bolt anchor position of the basin main unit.(3) Drill holes at the bolt anchor position of the basin main unit.(4) Remove the paper template.A flexible pipe of L = 200 mm is supplied with the product.The work to change the pipe from RS1/NRS is possiblewithout changing the rise point for the pipes.Changing the pipe form RS1/NRSWhen changing the pipe from NRS, the height of the riser drainage pipe must be adjusted to 110 mm.Floor Surface of Tile or Glass FinishThe tiles or glass of the floor surface will break whenthe bolts are embedded during installation of theshampoo unit. If this is the case, the installation areashould be finished with materials such as plywood ormortar.(1) Peel off the inner tiles or glass along the outsidelines of the installation area of the floor. The workmust be done carefully; otherwise, the peeledportion may be obvious.(2) Place composite panels in the peeled-off area.The panel surface should be higher than thesurrounding tile or glass surface (within 2 or 3 mm).Request measures to prevent water leakage under the floor and downstairsBe sure to take the necessary precautions to prepare for and prevent possible water leaks.(1) Make a cut in the pipe gasket at the pipe riser point.(2) Peel off the adhesive sheet on the pipe gasket and set the gasket on the floor.(3) Cut the gasket in a circle at the cut portion on the gasket along with the pipe, and then caulk the area around the pipe.Back End of BasinExterior Line of Cover Bolt Anchor Point Bolt Anchor Point Bolt Anchor PointChair SideThe floor surface requires the following strength:Distance from the end of the base side(aisle side) to the wall surface or furniture:Bolt Anchor Point Bolt Anchor PointEnd of Base SideArea of Floor Cutout 100 x 180Caution for Anchor Bolt InstallationAnchor bolts should be installed so that thescrews will protrude from the bolt head by 3 to5 mm. If the protrusion exceeds 5 mm, the bolthead may interfere with the cover.Exterior Line of CoverDistance from the end of thebasin to the wall surface orfurniture :or overor overBase End PositionBasin Sideor overor overBolt Anchor PointAvoid the anchor positions when installingthe pipe risers.Caution[ Unit : mm]