-7-Templete8.5 mm50mmor more deepFloor2 5mmCAUTIONBase PlateHammerFlat Washer NutCenter pinIf the anchor bolt is tapped with its and contacting the bottomof the hole, the strength will be lowered. Proper clearancemust exist between the end of the anchor bolt and the bottomof the hole.Do not make scratch or damage the floor while moving theunit. Please use the carriage jig to move it.4. Fix the main unit with the four screws.Plywood Floor : Hex head tapping screw M8 x 65Concrete Floor : Anchor bolts M8 x 705. When the moistureproof packing is bigger thanmain unit base, please cut it out.Construction process of anchor bolts.1.Drill the anchor holesof a specific diameterand depth.2.Clean each anchor holethoroughly using avacuum cleaner, with atnemhcattaelzzonworranto reach into the hole andremove all debris.3.Insert the anchor bolt, tappingit lightly with a hammer to seatit. Position the material, andthen drive the center pin intothe anchor unit it is snug.4.Adjust the fastening strengthof the nut using a wrench etc.Hold the Jig A and B to lift the unit by2 workers to move it. Otherwise, breakagemay result in.CAUTIONCarriage Jig ACarriage Jig B2. Hold the carriage jig and move the main unit tomarked position on the floor.3. Decide the installation position and remove thecarriage jig A and B from main unit base.