Supplied By www.heating spares.co Tel. 0161 620 6677Boiler Installation Sequence 5Instructions for Installation and Servicing turboMAX plus and thermoCOMPACT R1 15Selecting position of boilerRefer to "Boiler location“ for information regardingsiting the appliance. In general the boiler must bepositioned such that.• There is adequate space around the boiler for serviceand maintenance.• The boiler can be correctly flued, i.e. the flue terminalposition is sited in accordance with the fluetermination section and the air/flue duct can beinstalled in accordance with the flue installationinstructions supplied.• All necessary pipework can be connected, includingthe pressure relief valve.Note!Should it be necessary to run system pipeworkto above the boiler within the width of thecasing, use the optional top connectionaccessory (Art.No. 306 251).5 Boiler Installation Sequence5.1 GeneralPreparation of boiler locationClearances requiredMount the boiler on a flat and vertical area of wall ofsufficient area for the boiler plus the requiredclearances for installation and servicing.The clearances are as detailed below and are shown onthe installation template supplied with the boiler:- 150 mm below the boiler- 5 mm on either side of the boiler- 210 mm on top of the boiler- 500 mm in front of the boiler** Clearance is only required to enable easier access tothe boiler for servicing and may be provided by anopenable door, etc.Note!If the boiler is to be fitted in a timber framedbuilding, it should be fitted in accordance withInstitute of Gas Engineers PublicationIGE/UP/7/1998 "Guide for Gas Installations inTimber Framed Dwellings“.Fig. 5.1: Dimensions of boilerFig. 5.2: Free space required for installation440800338