Supplied By www.heating spares.co Tel. 0161 620 6677103.5 Air supplyDetailed recommendations for airsupply are given in BS 5440: Part 2.It is not necessary to have an air ventin the room or internal space in whichthe boiler is installed.3.5.1 Cupboard or compartment airsupplyTURBOmax Room Sealed CombinationBoilers are very high efficiencyappliances.As a consequence the heat loss fromthe appliance casing during operationis very low. For cupboard andcompartment installations it is thereforenot necessary to provide any high orlow level permanent air vents forcooling purposes.3.6 Electricity supplyA 230 V~ 50Hz single phaseelectricity supply fused to 3 amps mustbe provided in accordance with thelatest edition of BS7671 (I.E.E. WiringRegulations) and any other localregulations that may apply.THIS APPLIANCE MUST BE EARTHED.The method of connection to the mainselectricity supply must provide ameans of completely isolating theboiler and its ancillary controls.Isolation is preferably by the use of afused three pin plug and unswitchedshuttered socket outlet, both complyingwith the requirements of BS 1363.Alternatively, a 3 Amp fuseddouble-pole switch with a 3mmcontact separation on both poles maybe used.3.7 Guide to systemrequirements3.7.1 Water circulation systemDetailed recommendations for thewater circulation system are given inBS 6798 and BS 5449: Part 1 (forsmall bore and micro bore centralheating systems).Pipework not forming part of the usefulheating surface should be insulated tohelp prevent heat loss and possiblefreezing, particularly where pipes arerun through roof spaces and ventilatedunderfloor spaces.Draining taps must be located inaccessible positions which permit thedraining of the whole system includingthe boiler and the hot water system.Draining taps should be at least 1/2in. BSP nominal size and be inaccordance with BS 2879.The boiler is suitable for use withminibore or microbore systems.Copper tubing to BS 2871: Part 1should be used for water carryingpipework. All capillary joints in theDHW pipework must be made withlead free solder.Particularly where a new boiler is tobe fitted to an existing system, it isgood practice that the system isthoroughly cleansed. This cleasingshould take place prior to the fitting ofthe new boiler and be in accordancewith BS 7593.For advice on the application ofsystem cleansers contact Sentinel,Grace Dearborn Ltd, Widnes,Cheshire, WA8 8UD.Tel: 0151 4951861.