ecoTEC exclusive installation and maintenance instructions / 0020017768_048Carriage of carton from point of delivery to point ofinstallation – first or higher floor, cellar.• Recommend 2-person lift or 1 person with use of sacktruck.• If 1 person is performing lift, straddle the load, tilt andplace carton into position on truck.• Recommend secure appliance onto truck with suitablestraps.• Ensure safe lifting techniques are used – keep backstraight – bend using legs.• Keep load as close to body as possible.• If 2 persons performing lift, ensure co-ordinatedmovements during lift.• Avoid upper body/top heavy bending - do not lean for-ward/sideways.• Clear the route before attempting the lift.• If removing boiler from truck straddle the load and tiltforwards to facilitate secure grip.• Ensure safe lifting techniques are used – keep backstraight – bend using legs.• Do not twist – reposition feet instead.• Take care to avoid trip hazards, slippery or wet sur-faces and when climbing steps and stairs.• Always use assistance if required.Carriage of carton from point of delivery to point ofinstallation – roofspace.• Recommend 2-person lift.• Ensure co-ordinated movements during lift.• Avoid upper body/top heavy bending - do not lean for-ward/sideways.• Clear the route before attempting the lift.• Take care to avoid trip hazards, slippery or wet sur-faces and when climbing steps and stairs.• When transferring appliance into roofspace, recom-mend 1 person to be in roofspace to receive the appli-ance and other person to be below to pass up andsupport appliance.• Ensure safe lifting techniques are used – keep backstraight – bend using legs.• Keep load as close to body as possible.• Always use assistance if required.• It is assumed safe access, flooring and adequate light-ing are provided in the roof space.• It is recommended a risk assessment of the roof spacearea be carried out before moving the appliance into thearea to take into account access, stability of flooring, ligh-ting and other factors, and appropriate measures taken.Unpacking of appliance from carton.• Recommend 2 persons unpack appliance from carton.• Always keep working area clear.• Recommend straps and open carton flaps, then re-move items from the top including the polystyrenepacking and remove carton by sliding up over the boil-er.• Ensure safe lifting techniques are used – keep backstraight – bend using legs.• Keep load as close to body as possible.• Always use assistance if required.• Dispose of packaging in a responsible manner.• Recommend wear suitable cut resistant gloves withgood grip to protect against sharp edges and ensuregood grip when handling appliance outside packaging.Positioning of Appliance for Final Installation – noobstructions.• If appliance weight is over 25 kg always use 2 personsto move where practical.• Fit bracket securely onto wall before lifting applianceinto position.• Obtain firm grip on front and sides of appliance, liftupwards, ensure stable balance achieved and lift up-wards to position in place on bracket.• Ensure safe lifting techniques are used – keep backstraight – bend using legs - when lifting load fromfloor level.• Do not twist – reposition feet instead.• Keep boiler as close as possible to body throughoutlift to minimise strain on back.• Ensure co-ordinated movements to ensure equalspread of weight of load.• Always use assistance if required.• Recommend wear suitable cut resistant gloves withgood grip to protect against sharp edges and ensuregood grip when handling appliance.4 Assembly