Page 10 of 32 801530 - Zip HydroTap B, BA, BHA, BAHA, Installation Instructions - July 2014 - V1.08Before InstallationBefore installing ensure that the following have beenprovided at the Installation site:• Review all the technical specifications.• Ensure the underbench can support the product weight when full of water, (allow an extra 3-4kg when full. )• Sufficient space in the cupboard to install all of the undersink unitsin accordance with these Installation Instructions. Refer to technicalspecification for dimensions. Make allowance for a booster heater and/ or water softener if required. Refer to section 3 & 4, for Installationinstructions.• For Zip HydroTap 160 models, a 220-240Vac, 10A GPO will be required.For Zip HydroTap 240 models, two 220-240Vac, 10A GPOs will berequired. (One GPO is for the Zip HydroTap and the other for the Boosterheater).NOTE: Check all cable and hose lengths against inlet /outletpositions before proceeding (See section 5 for general layout).• A potable water supply connection with isolating valve inside thecupboard within reach of the braided hoses and positioned so that theconnection point and the stop cock will not be obstructed when theundersink units are installed.• If an external filtration or water softening device is required, then it isimportant to allow extra space for these items.• A cold water supply with a minimum working pressure of 172kPa and amaximum working pressure of 700kPa connected via an isolation valve.• The appliance must be placed with it’s base in a horizontal position.IMPORTANT! Do not proceed with the Installation if these requirements arenot met.