Unpacking and Installing the SwitchPowering Up the Switch5-6 ARX®1000 Hardware Installation GuideFigure 5-3. ON/OFF Power Switch (Rear View)See “Power Cord and Cable Requirements” on page 4-4 for power cord and cablespecifications.Powering Up the SwitchTo power up the switch, turn the ON/OFF toggle switch(es) to the ON position.CablingYou can cable the client/server ports before or after the switch is connected to thenetwork.Ethernet cables are supplied by the customer. For cable specifications andrequirements, see “Power Cord and Cable Requirements” on page 4-4. For cableconnector and pinout information, see “Cable Connectors and Pinouts” on page 4-5.! WARNING Before applying power, ensure that the AC outlet to the switch is properly grounded.