Keysight Technologies 53148A manuals
53148A
Table of contents
- safety information
- Serial Prefix Number
- Safety Symbols
- Safety Considerations
- Acoustic Noise Emissions
- Waste Electrical and Electronic Equipment (WEEE) Directive
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Performance Tests - Verifying Specifications Introduction
- Recommended Calibration Cycle
- Equipment Required
- Operational Verification
- MHz Test
- Run Self Test
- Figure 1-1 External Timebase Test Setup
- Power Meter Test
- DVM Test
- Complete Performance Tests
- Test 1: Channel 1 Frequency Sensitivity
- Figure 1-3 10 Hz to 20 MHz Frequency Sensitivity Test Setup
- Test 1b: 50 MHz to 125 MHz Frequency Sensitivity
- Test 2: Channel 2 Frequency Sensitivity
- Figure 1-5 50 MHz to 20 GHz Frequency Sensitivity Test Setup
- Test 2b: 22 GHz to 26.5 GHz Frequency Sensitivity
- Test 2c: 30 GHz to 46 GHz Frequency Sensitivity
- Test 3: Power Measurement
- Range Calibrator Settings and Expected Results
- Test 4: Power Reference Oscillator Frequency
- Figure 1-7 Reference Oscillator Frequency Adjustment Setup
- Test 5: Power Meter Reference Level
- Figure 1-9 Power Meter Reference Level Test Setup
- Power Meter Reference Level: Method 2
- Figure 1-11 Power Meter Reference Level Test Setup
- Performance Test Record (Page 1 of 3)
- Performance Test Record (Page 2 of 3)
- Performance Test Record (Page 3 of 3)
- Service Introduction
- Returning the Instrument to Keysight Technologies for Service
- Packing the Instrument in the Original Packaging Materials
- Calibration Procedures
- MHz Timebase Calibration
- Figure 2-1 Calibrating the 10 MHz Frequency Reference Oscillator
- Power Reference Oscillator Frequency Calibration
- Figure 2-2 Reference Oscillator Frequency Adjustment Setup
- Figure 2-3 Power Reference Oscillator Adjustment Locations
- Power Reference Oscillator Level Adjustment
- Figure 2-5 Power Meter Reference Level Test Setup
- Figure 2-6 Keysight 8120-1082 Power Sensor Cable End View
- Figure 2-7 Power Meter Reference Level Calibration Setup
- DVM Calibration
- Figure 2-8 DVM Tests Main Menu
- Pre-Troubleshooting Information
- Recommended Test Equipment
- After Service Considerations
- Assembly Identification and Location
- Figure 2-9 Replaceable Assembly Locations — Top Internal View
- Troubleshooting the Instrument
- A4 Power Supply Inputs and Outputs
- Self-Test
- Self-Test Messages
- Front Panel Display Error Messages
- RS-232 Error Messages
- Replacing Assemblies - Disassembly and Reassembly Introduction
- Tools Required
- Do This First
- Removing the Bumpers
- Removing the Handle
- Removing the Bumper Retainers
- Removing the Shroud
- Figure 3-4 Removing the Shroud
- Removing the Front Panel Assembly
- Figure 3-5 Removing the Front Panel Assembly
- Removing the Rear Panel Assembly
- Removing the Cooling Fan
- Removing the Power Supply
- Replaceable Parts Introduction
- Replaceable Parts
- Contacting Keysight Technologies
- Parts Identification
- Parts
- Table
- Keysight 53147A/148A/149A Accessories and Miscella neous Items
- Introduction
- 6 Specifications
- A Rack Mounting the Instrument Rack Mounting the Instrument
- Index
manualsdatabase
Your AI-powered manual search engine