Manuals database logo
manualsdatabase
Your AI-powered manual search engine

Nortel Communication Server 1000 manuals

Communication Server 1000 first page preview

Communication Server 1000

Brand: Nortel | Category: Server
Table of contents
  1. revision history
  2. Table Of Contents
  3. Table Of Contents
  4. Contents
  5. About this document
  6. Applicable systems
  7. Intended audience
  8. Preparing for installation
  9. Unpacking and inspecting
  10. Installing ISDN BRI hardware
  11. Procedure 1 Selecting the card slots
  12. Procedure 2 Remove the module cover for card installation
  13. Procedure 3 Installing the MISP
  14. Procedure 5 Installing the BRSC, SILC, and UILC
  15. Procedure 6 Remove the BRSC, SILC, and UILC
  16. Procedure 8 Connect the modules to the MDF
  17. Procedure 9 Cross-connecting SILC and/or UILC ports to the building wiring
  18. Procedure 10 Connecting the ISDN BRI terminals to the DSL
  19. Installing ISDN BRI hardware for trunk applications
  20. Procedure 11 Providing clock referencing on the SILC
  21. Procedure 12 Connecting clock reference cables
  22. Preparing the system
  23. Setting up ISDN BRI test terminals and trunks
  24. Configuring ISDN BRI hardware
  25. Configuring ISDN BRI trunking with IP expansion cabinets or MG 1000S systems
  26. Installation procedures
  27. Procedure 14 Selecting the card slots
  28. Procedure 15 Installing the MISP
  29. Procedure 16 Removing the MISP
  30. Procedure 17 Installing the SILCs and UILCs
  31. Procedure 18 Removing the SILC and UILC
  32. Procedure 20 Connecting system cables to the cross-connect terminal
  33. Procedure 21 Cross-connecting the DSLs at the cross-connect terminal
  34. Procedure 22 Connecting the terminating resistor to the SILC DSL
  35. Procedure 23 Connecting the ISDN BRI terminals to the DSL
  36. Procedure 24 Initializing a Nortel Networks M5317TDX terminal
  37. Procedure 25 Connecting the system cables to the cross-connect terminal
  38. Procedure 26 Cross-connecting DSLs at the cross-connect terminal
  39. Testing ISDN BRI functions
  40. Voice calls
  41. Procedure 28 Perform a Call Waiting test
  42. Procedure 29 Performing a Call Forward No Answer test
  43. Procedure 30 Perform a Calling Line Identification Presentation test
  44. Procedure 31 Perform an ISDN BRI Conference test
  45. Procedure 32 Perform a Call Join test on Conference
  46. Procedure 33 Perform a hunting test
  47. Procedure 34 Perform an ISDN BRI NI-1 Call Forward All Calls test
  48. Procedure 35 Perform an ISDN BRI ETSI Call Forwarding Unconditional test
  49. Circuit-switched data calls
  50. Packet data transmission
  51. Procedure 38 Perform a D-channel packet data transmission test using an external packet handler
  52. Procedure 40 Perform a B-channel Switched Virtual Circuit packet data transmission test using an MPH
  53. Testing an ISDN BRI trunk
  54. Generating traffic reports
Communication Server 1000 first page preview

Communication Server 1000

Brand: Nortel | Category: Server
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. Table Of Contents
  9. Table Of Contents
  10. Table Of Contents
  11. Table Of Contents
  12. Table Of Contents
  13. Table Of Contents
  14. Table Of Contents
  15. Table Of Contents
  16. Table Of Contents
  17. Procedure
  18. Revision history
  19. Getting help from the Nortel Web site
  20. Getting help from a specialist by using an Express Routing Code
  21. on the Nortel web site
  22. System information
  23. Applicable systems
  24. Safety instructions
  25. Lifting system equipment
  26. Installing telephones
  27. Installation summary
  28. Installation tasks
  29. System components
  30. Introduction
  31. CS 1000E Common Processor Pentium Mobile Call Server
  32. Signaling Server
  33. Media Gateway Controller
  34. MC32S Media Card
  35. Media Gateway
  36. Media Gateway Expander
  37. inch Rack Mount Kit
  38. BayStack 470 Switch
  39. BayStack 460 Layer 2 switch
  40. inch rack
  41. Miscellaneous system components
  42. Rack-mounting the components
  43. Lifting system components
  44. Guidelines for component placement in a rack
  45. Rack-mounting a Media Gateway or Media Gateway Expander
  46. Rack-mounting a Terminal Server
  47. Installing system grounds
  48. Installing a ground bar
  49. Installing an NTBK80 Ground Bar
  50. Installing an NTDU6201 Ground Bar
  51. Grounding an ISP1100 Signaling Server
  52. Grounding Media Gateways powered by the same electrical panel
  53. Grounding a Media Gateway powered by multiple electrical panels
  54. Grounding other rack-mounted components
  55. Grounding equipment in the UK
  56. Installing and connecting CS 1000E hardware
  57. Connecting CP PM Call Server 0 to CP PM Call Server 1
  58. Connecting co-located CP PM Call Servers
  59. Installing the cards
  60. Installing a DSP Daughterboard
  61. Installing the CP PM card
  62. Cabling the cards
  63. adapter onto a Media Card
  64. Inserting a Shielded 50-pin to Serial/ELAN/TLAN adapter
  65. Connecting a Media Card to the ELAN subnet
  66. Connecting a Media Card to the TLAN subnet
  67. Installing software on the CS 1000E
  68. Installing the software
  69. Reconfiguring I/O ports and call registers
  70. Testing the CP PM Call Server
  71. Making the system redundant
  72. Testing CP PM Call Server 0
  73. Switching call processing
  74. Testing CP PM Call Server 1
  75. Configuring initial IP configuration data on MGC
  76. Configuring the MGC on the Call Server
  77. Call Server
  78. Configuring login IDs and passwords
  79. Enabling the multi-user option
  80. Configuring pseudo-terminals (PTYs)
  81. Checking PTY status
  82. Configuring Virtual Tone and Conference Circuits
  83. Configuring the MG 1000E Bandwidth Management Zones
  84. Configuring the MG 1000E ports
  85. Configuring Digitone Receivers
  86. Configuring Tone Detectors
  87. Launching Element Manager
  88. Importing preconfigured IP telephony files
  89. Reviewing and submitting IP telephony node configuration files
  90. Installing a Signaling Server
  91. Readiness checklist
  92. Installing the CP PM Signaling Server hardware
  93. Connections
  94. Connecting a Nortel CP PM Signaling Server
  95. E system
  96. M system
  97. Connecting an IBM X306m Signaling Server
  98. Connecting an HP DL320-G4 Signaling Server
  99. Installing the Signaling Server software
  100. Installing Signaling Server software
  101. First boot of a new Nortel CP PM Signaling Server
  102. Entering basic system configuration parameters
  103. Adding a Follower Signaling Server to an IP Telephony node
  104. Unpacking Help files for Virtual Terminal Emulator
  105. Logging in to the Signaling Server
  106. Verifying a successful configuration
  107. NN43041-310 Standard 01.11 October
  108. Configuring the IPMG
  109. Configuring the IPMG (Element Manager)
  110. Configuring conference TDS
  111. Configure conference TDS (CLI)
  112. Configuring conference TDS (Element Manager)
  113. Configuring DSP Daughterboard Voice gateway channels
  114. Connecting an IR-8020M
  115. Configuring a Terminal Server
  116. Connecting a Terminal Server to the system
  117. Configure IP address for the Terminal Server
  118. Telnet Terminal Server virtual management port
  119. Telnet CS 1000E COM port from a PC
  120. Configuring a transparent rlogin port
  121. Accessing an MRV Console Port through the on-board modem
  122. CS 1000E COM port types
  123. Server
  124. Accessing a CS 1000E from a PC through telnet Terminal Server
  125. Configuring an rlogin port for various applications
  126. Configuring a terminal and SDI ports
  127. Setting the TTY terminal port
  128. CS 1000E CP PM Call Server COM Port connections
  129. MG 1000E SDI connection
  130. Connecting SDI ports on the Media Gateways
  131. BayStack 470 SDI connection
  132. Installing and cross-connecting a trunk card
  133. Circuit card options
  134. Connecting a trunk
  135. Universal Trunk card connections
  136. E&M Trunk card connections
  137. Trunk connections (Europe)
  138. Trunk connections (UK)
  139. NN43041
  140. Verifying trunk functionality
  141. Voice Gateway Media Card
  142. Configuring a card
  143. Configuring a card as a node Leader
  144. Configuring voice gateway channels using Element Manager
  145. Configuring voice gateway channels using LD 14
  146. Saving configuration changes
  147. Installing a CompactFlash
  148. Installing the CompactFlash
  149. Installing a card in a Media Gateway
  150. Installing a Voice Gateway Media Card in a card slot
  151. Verifying a card
  152. Displaying the Voice Gateway status for all voice gateway channels
  153. Displaying the status of Voice Gateway Media Card units
  154. Disabling a card
  155. Disabling a card unit
  156. Enabling a card
  157. Enabling a card unit
  158. Verifying functionality
  159. Installing the Main Distribution Frame
  160. Terminal block requirements
  161. Installing a Krone Test Jack Frame for the UK
  162. Installing the Krone Test Jack Frame (UK)
  163. Connecting the cables to the Media Gateways
  164. Configuring an IP telephony node
  165. Before you begin
  166. Configuring MS Internet Explorer
  167. Logging in to Element Manager
  168. Performing a datadump
  169. Performing a datadump using Element Manager
  170. cross-connecting telephones
  171. Card placement in a Media Gateway or a Media Gateway Expansion
  172. Connecting a telephone without a PFTU
  173. Connecting an off-premise telephone
  174. Connecting an attendant console
  175. Installing and configuring Nortel IP Phones
  176. Package components for the Nortel IP Phones
  177. Setting passwords for the administrator and temporary
  178. Configuring VoIP bandwidth management zones
  179. Configuring virtual superloops
  180. Configuring the IP Phones
  181. Installer passwords
  182. Installing Nortel IP Phone hardware components
  183. Configuring the Nortel IP Phone boot parameters
  184. Entering Nortel IP Phone boot parameters using manual configuration
  185. Entering Nortel IP Phone boot parameters using full DHCP parameters
  186. Entering boot parameters using partial DHCP parameters
  187. Using Set-Based Installation
  188. Installing the IP Softphone 2050
  189. Configuring the IP Softphone 2050
  190. Installing the USB Headset Kit
  191. Verifying Nortel IP Phone functionality
  192. Power Fail Transfer Unit
  193. Installing and connecting a QUA6 PFTU
  194. Installing and connecting a third-party PFTU
  195. Connecting an analog (500/2500-type) telephone to a PFTU
  196. Connecting a trunk to a PFTU
  197. Installing and cross-connecting
  198. an external alarm from a PFTU
  199. Installing an alarm using an alarm port assigned in LD 15
  200. Installing an alarm through QUA6 PFTU connections
  201. Basic system telephony configuration
  202. Configuring the basic system
  203. TN assignment
  204. managing the Gatekeeper database
Nortel categories
More Nortel categories
Manuals database logo
manualsdatabase
Your AI-powered manual search engine