Carrier OPN-VVTZC manuals
OPN-VVTZC
Table of contents
- Table Of Contents
- Table Of Contents
- Introduction
- Specifications
- Safety Considerations
- Installation
- Mounting the VVT Zone Controller
- Wiring the VVT Zone Controller for power
- To wire the controller for power
- Wiring the VVT Zone Controller to the MS/TP network
- Wiring sensors to inputs
- Wiring an SPT sensor
- To wire the SPT sensor to the controller
- Wiring a T55 space temperature sensor
- Wiring a Supply Air Temperature sensor
- Wiring a Duct Air Temperature sensor
- Wiring a CO2 sensor
- Wiring a Relative Humidity sensor
- To wire the RH sensor to the controller
- Wiring specifications
- Wiring diagram legend
- Single duct 2-position hot water
- Single duct combination base board and ducted heat
- Fan box 2-position hot water
- Fan box combination baseboard and ducted heat
- Wiring field-supplied actuators to the analog output
- Linked actuators
- Start-up
- Unit Configuration properties
- Service Configuration properties
- Linkage properties
- Performing system checkout
- Commissioning the VVT Zone Controller
- Step 1: Prepare for balancing
- Step 3: Set the system static pressure
- Sequence of operation
- Zone airflow control
- Zone reheat control
- Demand control ventilation (DCV) and dehumidification using optional sensors
- Occupancy
- Alarms
- Demand limiting
- Air source mode determination
- Troubleshooting
- Serial number
- Compliance
- Appendix A: VVT Zone Controller Points/Properties
- Unit Configuration
- Setpoints
- Alarm Configuration
- Service Configuration
- Maintenance
- I/O Points
- Appendix B: VVT terminal modes
- Index
manualsdatabase
Your AI-powered manual search engine