Zeiss S81 manuals
S81
Table of contents
- Table Of Contents
- New installation of S8 / S 81 ceiling mount
- Technical data
- S81 ceiling mount, dimensions
- Pre-installation set
- Installation position in the OR
- Operating position
- Operating range of the ceiling mount
- On-site preparations
- Building vibrations
- Customer's preparatory responsibilities, overview
- Constructional requirements
- Mounting a pre-installation set on ceilings with air-supply ceiling
- Planning the electrical installation
- Installing the conduits
- Mounting the wall socket
- On-site electrical installation
- Checking the power connection
- Planning the mechanical installation
- mounting the spacers
- Confirmation of the structural calculation and execution of installation
- Ordering data
- S8 ceiling mount for ORs without false ceilings, ordering data
- Accessory interface
- Installation position
- Mount flange and ceiling panel
- Mount flange (flange plate)
- Configuration example: mount flange with flange tube
- Customer's responsibilities
- Electrical connections for accessory modules
- Discipline-specific installation positions
- Installation positions for ophthalmology and ENT
- installation position for p&r, hand
- Installation position for Neuro, Spine, Uro and Gyn
- Installation on an existing substructure
- Installation options
- mounting options
- installation on an intermediate piece of s23 or emd
- Installation on an existing ZDK intermediate piece
- Installation on ceiling track mount
- Index
- Table Of Contents
manualsdatabase
Your AI-powered manual search engine