Installation checklist35Installation checklistChecklistCheck the mechanical and electrical installation of the drive before start-up. Gothrough the checklist below together with another person. Read chapter Safety onthe first pages of this manual before you work on the drive.CheckMECHANICAL INSTALLATIONThe ambient operating conditions are allowed. (See Mechanical installation: Requirementsfor the installation site on page 18, Technical data: Cooling air flow requirements on page 111and Ambient conditions on page 116.)The drive is fixed properly on an even vertical non-flammable wall. (See Mechanicalinstallation.)The cooling air will flow freely. (See Mechanical installation: Free space around the drive onpage 19.)The motor and the driven equipment are ready for start. (See Planning electrical installation:Motor selection on page 21 and Technical data: Motor connection on page 114.)ELECTRICAL INSTALLATION (See Planning electrical installation and Electrical installation.)For ungrounded and corner grounded systems: The internal EMC filter is disconnected(screw EMC removed).The capacitors are reformed if the drive has been stored over two years.The drive is grounded properly.The input power voltage matches the drive nominal input voltage.The input power connections at U1, V1 and W1 are OK and tightened with the correct torque.Appropriate input power fuses and disconnector are installed.The motor connections at U2, V2 and W2 are OK and tightened with the correct torque.The motor cable is routed away from other cables.The external control (I/O) connections are OK.The input power voltage cannot be applied to the output of the drive (with a bypassconnection).Terminal cover and, for NEMA 1, hood and connection box, are in place.