Installation checklist31Installation checklistChecklistCheck the mechanical and electrical installation of the drive before start-up. Gothrough the checklist below together with another person. Read chapter Safety onthe first pages of this manual before you work on the drive.CheckMECHANICAL INSTALLATIONThe ambient operating conditions are allowed. (See Mechanical installation: Requirementsfor the installation site on page 22, Technical data: Cooling air flow requirements on page 39and Ambient conditions on page 41.)The drive is fixed properly on an even vertical non-flammable wall. (See Mechanicalinstallation.)The cooling air will flow freely. (See Mechanical installation: Free space around the drive onpage 22.)The motor and the driven equipment are ready for start. (See Planning electrical installation:Motor selection in the ACS350 Userís Manual and Technical data: Motor connection onpage 40.)ELECTRICAL INSTALLATION (See Planning electrical installation and Electrical installation.)For ungrounded and corner grounded systems: The internal EMC filter is disconnected(EMC screw removed).The capacitors are reformed if the drive has been stored over two years.The drive is grounded properly.The input power voltage matches the drive nominal input voltage.The input power connections at U1, V1 and W1 are OK and tightened with the correct torque.Appropriate input power fuses and disconnector are installed.The motor connections at U2, V2 and W2 are OK and tightened with the correct torque.The motor cable is routed away from other cables.The external control (I/O) connections are OK.The input power voltage cannot be applied to the output of the drive (with a bypassconnection).Cable glands are tightened and the cover is in place.The gaskets are in place.