Finalizing the installationContents of this chapterThis chapter describes how to finalize and check the installation of the PVS-175 mediumvoltage station (MVS). Obey all local regulations.WARNING!Only an authorized electrician is permitted to install the cabling to the MVS. Obeythe Safety instructions (page 9), and the local safety regulations. If ignored,physical injury or death may occur, or cause damage to the equipment.WARNING!Do not do electrical installation work during a thunderstorm.WARNING!Make sure that all external cable entries are fully sealed to prevent entry of foreignelements, such as animals and insects.Finalizing the installation• Clean the MVS of all dirt.• Repair any damages to the paint surface. See section, Maintenance of paintedsurfaces (page 62).• If not yet done, seal the cable entries, cover the cable entries with sand and sprinkle ahandful of cement over the sand. The cement hardens in a few days and it forms abarrier against small animals and plant growth.6Finalizing the installation 49