Start-up and operationContents of this chapterThis chapter describes the start-up procedure of the PVS-175 medium voltage station (MVS)and the general operation criteria.WARNING!Only an authorized electrician is permitted to install the cabling to the MVS. Obeythe Safety instructions (page 9) and the local safety regulations. If ignored,physical injury or death, or damage to the equipment may occur.WARNING!Do not do electrical installation work during a thunderstorm.Tools needed• Voltage detector• Insulation resistance meter. For more information, see section Measuring the insulationresistance of the cabling (page 43).• Personal protective equipmentPrerequisiteWARNING!Use original silica gel bags only during transport. Install new silica gel bags forstorage.1. Remove the transportation covers.7Start-up and operation 5112