Section 3 Network Turnup Procedure ATLAS 550 System Manual52 © 2004 ADTRAN, Inc. 61200305L2-1B1. INTRODUCTIONThis section discusses the ATLAS 550 System installation.2. TOOLS REQUIREDThe tools required for installation of the ATLAS 550 unit are:• #2 Phillips-head screwdriver• Flat-head screwdriver (for installing modules)3. UNPACK AND INSPECT THE SYSTEMThe ATLAS 550 is shipped in its own cardboard shipping carton. Open the carton carefully and avoid deeppenetration into the carton with sharp objects.After unpacking the unit, inspect it for possible shipping damage. If the equipment has been damaged intransit, immediately file a claim with the carrier, and then contact ADTRAN Customer Service (see thecontact information in the front of this manual).Contents of ADTRAN ShipmentsYour ADTRAN shipment includes the following items. (Shipping contents for the modules begin onpage 57.)• The ATLAS 550 unit• The ATLAS 550 Product CD• AC power cord - ADTRAN P/N 3127031 (with AC systems)• 19” rackmount brackets and screws• RJ-45 to DB-25 adapter - ADTRAN P/N 3196ADPT006To prevent electrical shock, do not install equipment in a wet location or during alightning storm.Electronic modules can be damaged by static electrical discharge. Before handlingmodules, put on an antistatic discharge wrist strap to prevent damage to electroniccomponents. Place modules in antistatic packing material when transporting or storing.When working on modules, always place them on an approved antistatic mat that iselectrically grounded.Customers must supply the Ethernet cable.