OmniCare EVC SystemInstallation & Commissioning ManualOmniCare issue 1 47COM MUNICATIONS4 Testing & CommissioningThe Commissioning Procedure must be followed:• At first installation to enable the OmniCare EVC System to“learn” about the system configuration,• If a Remote Unit has been added, removed or replaced in anexisting system.4.1 O VERVIEW OF THE C OMMISSIONINGP ROCEDUREA brief description of the Commissioning Procedure is as follows:• Check basic Loop Integrity using a multimeter,• Configure jumpers on each Master & Slave panel,• Run the Commissioning Process on the Master Panel tocheck the wiring of each Loop and identify Remote Units,• Connect Batteries & Mains Power,• Configure and check operation of each Remote Unit.N OTE: If Baldwin Boxall are contracted to perform the Commission on anew installation please contact Technical Sales to confirm the requiredconfiguration (i.e Remotes connected, panels connected etc).