P1512021 R6 454.12. Install the Cable Bridge (55' — 95' Models)This procedure describes how to attach the cable bridges on the conveyor tube.For component identification and placement, refer to:• Table 12 on page 45• Figure 17 on page 46 to Figure 18 on page 471. Locate the cable bridge brackets on the tube.2. Attach cable bridge (1) to each cable bridge brackets with 7/16" x 1–1/2" bolts (2) and 7/16" nuts (3). SeeFigure 17 for cable bridge locations.3. Install cable clamps (4):Æa. For 55' — 75' Models: Loosely install four cable clamps (4) on the cable bridge.Æb. For 85' Models: Loosely install two cable clamps (4) on the cable bridge nearest to the hopper, and fourcable clamps (4) on the cable bridge nearest to the spout.Æc. For 95' Models: Loosely install two cable clamps (4) on the cable bridge nearest to the hopper, and fourcable clamps (4) on the center cable bridge and on the cable bridge nearest to the spout.ImportantBefore installing cable clamps, replace the existing cable hex nuts with 3/8" nylock nuts (5).Table 12. Cable Bridge ComponentsItem Description1 High Cable Bridge2 7/16" x 1-1/2" Bolt GR83 7/16" Locknut4 3/8" Cable Clamp5 3/8" LocknutPORTABLE GRAIN BELT CONVEYOR – STANDARD 4. ASSEMBLY