REQUIRED CLEARANCES TO COMBUSTIBLE MATERIAL — in. (mm)Unit Top . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 (356)Duct Side of Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 (51)Side Opposite Ducts . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 (356)Bottom of Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0Vertical Discharge First 12 in. (305) of Supply Duct . . . . . . . . . . . . 1 (25)NECESSARY REQUIRED CLEARANCES — in. (mm)Between Units, Control Box Side . . . . . . . . . . . . . . . . . . . . 42 (1067)Unit and Ungrounded Surfaces, Control Box Side . . . . . . . . . . . . 36 (914)Unit and Block or Concrete Walls and Other GroundedSurfaces, Control Box Side . . . . . . . . . . . . . . . . . . . . . . 42 (1067)REQUIRED CLEARANCES FOR SERVICING — in. (mm)Evaporator Coil Access Side . . . . . . . . . . . . . . . . . . . . . . . 30 (762)Control Box Access Side . . . . . . . . . . . . . . . . . . . . . . . . . 30 (762)(Except for Necessary Requirements)Unit Top . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 (914)Side Opposite Ducts . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 (762)UNIT50SSCENTER OF GRAVITY (in./mm)X Y Z048 21.7/550 19.7/501 15.7/400060 22.0/560 19.9/506 15.7/399LEGENDCG — Center of Gravity NEC — National Electrical CodeCOND — Condenser REQ’D — RequiredMAT’L — MaterialNOTES:1. Clearances must be maintained to prevent recirculation of air from outdoor-fan dis-charge.2. Dimensions in ( ) are in millimeters.UNIT50SS ELECTRICALCHARACTERISTICSUNIT WT CORNER WT (Lb/Kg)Lb Kg A B C D048 208/230-1-60, 208/230-3-60, 460-3-60 352 160 87/40 73/33 136/62 56/25060 208/230-1-60, 208/230-3-60, 460-3-60 379 172 70/32 104/47 125/57 80/36Fig. 5 — Dimensions; Units 50SS048,060 With Optional Base Rail5