These furnaces are shipped with the following materials to assist inproper furnace installation. These materials are shipped in the mainblower compartment.Installer Packet includes:Installation, Start-Up, and Operating InstructionsService and Maintenance InstructionsUser’s Information ManualWarranty CertificateLoose Parts Bag includes: QuantityPressure tube extension 1Collector box or condensate trap extension tube 1Fig. 3—Clearances to CombustiblesA02250Clearance in inches.Vent clearance tocombustibles 0".This furnace is approved for UPFLOW, DOWNFLOW andHORIZONTAL installations.*BOTTOM0"Ø3"0"§0"TOP/PLENUM1"0" §30MINALL POSITIONS:S I D E F R O N TB C KAS E R VI ECF RON TS I D EUF R N A C EClearance arrowsdo not change withfurnace orientation.†328068-201 REV. ALIT - TOPMINIMUM INCHES CLEARANCE TO COMBUSTIBLE CONSTRUCTION†HORIZONTAL POSITIONS:DOWNFLOW POSITIONS:§Ø* Mimimum front clearance for service 30 inches (762mm).This forced air furnace is equipped for use with natural gas at altitudes 0 - 10,000 ft (0 - 3,050m), except 140 size furnaces are only approved for altitudes 0 - 7,000 ft.(0 - 2,135m).An accessory kit, supplied by the manufacturer, shall be used to convert to propane gas use or may be required for some natural gas applications.This furnace is for indoor installation in a building constructed on site. This furnace may be installed in a manufactured (mobile) home when stated on rating plate andusing factory authorized kit.This furnace may be installed on combustible flooring in alcove or closet at Minimum Inches Clearance To Combustible Construction as described below.This furnace requires a special venting system. Refer to the installation instructions for parts list and method of installation. This furnace is for use with schedule-40 PVC,PVC-DWV, CPVC, or ABS-DWV pipe, and must not be vented in common with other gas-fired appliances. Construction through which vent/air intake pipes may beinstalled is maximum 24 inches (600 mm), minimum 3/4 inches (19 mm) thickness (including roofing materials).UPFLOW ORDOWNFLOW1/2" MAXLEVEL (0")TOFor upflow and downflow applications, furnace must be installed level, or pitched within 1/2" of level. For ahorizontal application, the furnace must be pitched minimum 1/4" to maximum of 1/2" forward for properdrainage. See Installation Manual for IMPORTANT unit support details on horizontal applications.HORIZONTALMIN 1/4" TO 1/2" MAXFor installation on combustible floors only when installed on special base No.KGASB0201ALL, Coil Assembly, Part No. CD5 or CK5, or Coil Casing, Part No. KCAKC.Line contact is permissible only between lines formed by intersections of top and two sidesof furnace jacket, and building joists, studs, or framing.Clearance shown is for air inlet and air outlet ends.120 size furnace requires 1 inch bottom clearance to combustible materials.FRONT FRONTINSTALLATIONFig. 4—Return-Air TemperatureA93042Fig. 5—Installation in a GarageA9304418-IN. MINIMUMTO BURNERS4