Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.Catalog No. 532-309 Printed in U.S.A. Form 23XRV-1SI Pg CL-1 309 6-06 Replaces: NewBook 2Tab 5eINSTALLATION START-UP REQUEST CHECKLISTMachine Model Number: 23XRV Serial Number:To:Attn.:DateProject NameCarrier Job NumberThe following information provides the status of the chiller installation. Send a copy of this checklist to the local Carrier Service officeafter it has been completed and signed-off by the Purchaser and Job Site Supervisor.YES/NO DATE TO BE(N/A) COMPLETED1. The machine is level within 1/2 in. end to end.2. The machine components are installed and connected inaccordance with the installation instructions.3. The isolation package and grouting (if necessary)are installed.4. The relief valves are piped to the atmosphere.5. All piping is installed and supported. Direction of flowis indicated in accordance with the installation instructionsand job prints.a. Chilled water pipingb. Condenser water pipingc. Waterbox drain pipingd. Pumpout unit condenser piping (if installed)e. Other6. Gages are installed as called for on the job prints requiredto establish design flow for the cooler and condenser.a. Water pressure gages IN and OUTb. Water temperature gages IN and OUT7. The machine’s control center wiring is complete. The wiring isinstalled per installation instructions and certified prints.a. Power wiring to VFD circuit breaker. (If chiller was disassembled during installation, motor leads mustnot be taped until the Carrier technician megger teststhe motor.)b. Carrier controls can independently energize water pumpsand tower fan.c. Line side voltage is within ±10% of chiller nameplate voltage.d. OtherCOMMENTS: