Page 1-28daCor builT-in refrigeraTor serviCe manualMore than 1" ClearanceUse the anti-tipping kit provided with the shippingcrate. Locate and mark the 2 wall studs behindthe unit. Mark where the “L” brackets and 2x4will be located and drill 2 pilot holes 1/8". Locatethe proper height to clear the unit. The spacebetween the top of the unit and bottom of thewood block must not exceed ¼". Secure the “L”brackets, using the provided screws, into the wallstuds (). Make sure the screws will extend 7/8"into the wall studs. Align the pilot holes with the“L” brackets and secure the 2x4 with the screwsprovided (, ).Blocking the UnitIf there is a solid soffit above the unit and theclearance is 1" or less you will not need to blockthe unit. For installations with clearances of morethan 1", you must use the anti-tipping 2x4 andbrackets provided (Fig. 6).SoffitMore thanan 1"123Wall StudsdaCor builT-in refrigeraTor serviCe manualFig. 6Fig. 7