Installationwww.DaikinApplied.com 5 IM 1240-4 • INTELLIGENT EQUIPMENTInstallationUnpackingMaterial shipped looseFactory Installed Intelligent EquipmentIf the Intelligent Equipment solution was ordered with the chiller,rooftop, or air handling unit, it shipped with the M2M, EMM,CT’s, Powers Supply and Fuse Block already installed in thecontrol enclosure, and associated interconnections alreadymade. On chillers, the antenna bases are shipped inside thecontrol enclosure, along with the antenna flags and Ethernetadapter. The coaxial cable for the antenna bases must be routedto the control enclosure once the antenna base is installed inthe field. If needed, the Ethernet adapter is field-installed. Forrooftop units, the antenna bases are pre-installed, antenna flagsand Ethernet adapter ship inside the schematics envelope forthe unit. The antenna(s) and Ethernet adapter are field-installed.Retrofit Intelligent Equipment on ChillersWhen the Intelligent Equipment solution is ordered for retrofitinstallation, the following components will ship as a kit:• M2M Gateway• Power Supply• EMM (Not on Gateway-on-the-Go or IE Express kits)• Fuse Block (with 5A Fuses pre-installed) (Not onGateway-on-the-Go or IE Express kits)• Antenna flag and base• Three Current Transformers (CT’s) (Not on Gateway-on-the-Go or IE Express kits)• 3' USB cable (Not on Gateway-on-the-Go or IE Expresskits)• 6' Ethernet Patch cable• USB-to-Ethernet Adapter• 6" EMM Wiring Harness (Not on Gateway-on-the-Go orIE Express kits)• 6' EMM Wiring Harness (Not on Gateway-on-the-Go or IEExpress kits)• Hardware packet, including (1) patch plate with twowatertight grommets pre-installed, (1) 0.875" grommet,(2) grounding harnesses, (1) 3-wire voltage harness,wire ties, wire tie hangers, (12) self-tapping sheet metalscrews, (1) section of 600V-rated heat shrink tubing.Upon receiving, verify that all components are present, andnotify the supplier of any shortage.Retrofit Intelligent Equipment on Rooftop, orAir Handling UnitWhen the Intelligent Equipment solution is ordered for retrofitinstallation on a rooftop or air handling unit, the followingcomponents will ship loose:• Two Mounting brackets. One bracket contains the M2MGateway and power supply, the other contains the EMMand fuse block (with 5A Fuses pre-installed) (EMM andFuse block not included for Gateway-on-the-Go or IEExpress kits)• Antenna flags and bases• Three Current Transformers (CT’s) (Not on Gateway-on-the-Go or IE Express kits)• 3' USB cable (Not on Gateway-on-the-Go or IE Expresskits)• 6' Ethernet Patch cable• USB-to-Ethernet Adapter• 6" EMM Wiring Harness (Not on Gateway-on-the-Go orIE Express kits)• 6' EMM Wiring Harness (Not on Gateway-on-the-Go or IEExpress kits)• Hardware packet, including (1) patch plate with twowatertight grommets pre-installed• (2) 5/8" bushings• (1) grounding harness• (1) 3-wire voltage harness, wire ties, wire tie hangers• (12) self-tapping sheet metal screws• (1) section of 600V-rated heat shrink tubing.Upon receiving, verify that all components are present, andnotify the supplier of any shortage.Necessary Tools• Corded (or powerful cordless) Drill• 7/8" Step Drill Bit (suitable for drilling through metalenclosure)• 1/4" Drill Bit for wire tie hangers (suitable for drillingthrough metal enclosure)• 3/32" Drill Bit for pilot holes (suitable for drilling throughmetal enclosure)• Multimeter• Wire strippers• SAE hex wrench set• Precision screwdriver set• #2 Phillips screwdriver• #2 Flat screwdriver• 5/16" Nut driver• Hammer• Pliers• Small carpenter square (8" × 12")• Level• Clear silicone sealant