ESIE09-08 Test OperationTest Operation 731.1.2 Turn Power OnTurn outdoor unit p ower on .Turn indoor unit p ower on .(V3056) Be sure to turn the power on 6 hours before starting operation toprotect compressors. Close outside panels of the outdoor unit. Wait until initialization period is over (up to 12 min).(Can be known by checking leds on outdoor PCB - see “FieldSettings from Outdoor unit” for details.Car ry out the test run asdesc ribed in the installationmanual of the indoor unitCarry out field setting, ifnecessary