Installing the Hardware 9CAUTION: Before connecting a transceiver to a source, check the receivepower of the transceiver with an optical power meter. Generally, Dell Force10specified optics are not to be subjected to receive power higher than thatstipulated by the optic specification. If the optic is exposed to optical power inexcess of the specification, there is a high likelihood that it will be damaged.Optical specifications for Dell Force10 branded devices are at the followingURL: http://www.force10networks.com/products/mediaspecifications.aspS2410 SpecificationsChassis Physical DesignStep Task1 Position the XFP so it is in the upright position (XFPs on the bottom(even-numbered ports) are upside down; odd-numbered ports (on top)install right-side up), with the bail latch on top in the closed position, asshown here. For details on XFP installation, see the instruction thataccompanies the XFP.2 Insert the XFP gently into the port until it snaps into place. (The designof the XFP prevents it from seating incorrectly.)3 The XFP transceiver contains Rx and Tx labels on the two fiber opticconnections, and the connections have keyways that prevent insertingthe cables incorrectly.Parameter S2410P S2410CPHeight 1.73 inches (4.4 cm) 1.73 inches (4.4 cm)