Tower-to-Rack Conversion Guide 17Installing the Control Panel Assembly1 Install the control panel assembly.a Insert the display module into the front panel cutout and secure with the two M3 x 12 T10 Torxpanhead screws.NOTICE: Do not over-tighten the screws.b Locate the replacement label for the front of the display, remove the liner from the adhesivebacking on the label, and apply the label to the front of the display module.c Install the control panel board in the system chassis directly behind the display module andsecure with the three M3 x 5 T10 Torx panhead screws. See Figure 1-7.NOTICE: Do not over-tighten the screws.d Reroute the control panel interface cable back into the interior of the system chassis, andconnect the control panel interface cable to the control panel board. See Figure 1-7.e Connect the display module cable to the connector on the control panel board. See Figure 1-7.Ensure that the cable is fully seated before you press the locking ring into position.2 Install the metal filler panel into the chassis cutout where the control panel cable formerly routed. SeeFigure 1-6.3 Reinstall the hard-drive carriers, drive blanks, and filler panels into their respective drive bays.NOTE: Ensure that the hard drives, any optical drives, and devices are reinstalled into the same positionsfrom which they were removed. The devices should be labeled appropriately.book.book Page 17 Friday, May 26, 2006 3:03 PM