INSTALLATIONEaton 9140 EBM User's Guide 164201623 Rev C www.eaton.com/powerquality18Rack Setup for the EBMNOTE Mounting rails are required for each individual cabinet.NOTE The recommended configuration is to install the EBM(s) in the lower part of the rack,with the UPS directly above the EBM(s).To install the EBM rail kit:1. Select the proper holes in the rack for positioning the EBM in therack (see Figure 1).NOTE The EBM takes up position 1 through position 9.Position 2Position 5Position 8ScrewPositions forRail and FrontMountingBracketPosition 4Position 3Bottom of Rackor Top of OtherCabinetFigure 1. Front Rail Screw Positions for the EBM2. If access to the sides of your rack is difficult, adjust the length ofthe rails (see Figure 3) and loosely install the fasteners (seeFigure 5) before continuing to Step 3.