OPERATIONEaton 9140 EBM User's Guide 164201623 Rev C www.eaton.com/powerquality30Initiating the Battery TestNOTE The batteries must be fully charged and the UPS must not be in Battery mode toperform the battery test.NOTE For an accurate battery test, test the UPS with at least 10% load applied to the UPS.You can configure the battery test settings, initiate a test, cancel a test,and view the test report.Configuring the Battery Test. The UPS automatically performs a batterytest approximately every 90 days if this option is enabled. To enable ordisable the automatic battery test, select MENU from the system statusscreen, then select SETUP, USER SETUP, and BATTERY TEST. Selectto enable or disable the automatic test.Initiating a Battery Test. To initiate a manual battery test, select MENUfrom the system status screen, then select CONTROL, BATTERY TEST,and SCHEDULE TEST. The UPS verifies the battery converter andschedules the battery test to occur during the next appropriate stage inthe charging cycle (or immediately if possible). During the battery test,the indicator flashes rapidly.Canceling a Battery Test. To cancel a test already scheduled, select MENUfrom the system status screen, then select CONTROL, BATTERY TEST,and CANCEL TEST.Viewing the Battery Test Report. To view a report of the latest battery test,select MENU from the system status screen, then select CONTROL,BATTERY TEST, and TEST REPORT.