2EATON IB501001EN Installation instructionsInstallation Instructions - Arbor BollardINSTALLATIONTools RequiredRatchet, a shallow 3/4” socket or 3/4” wrench for 1/2”hex nuts, #2 Phillips head screw driver, torque wrench and5/32” Allen wrench.How to Install (Figure 1. - Figure 4.)1. Install foundation anchors and conduit using suppliedanchor template as illustrated. (Figure 1.)2. Remove Luminaire from packaging and set aside in asafe place to prevent scratching or other damage tohousing or lens.3. Remove base driver assembly by loosening threescrews from bottom of luminaire and pull driverassembly from housing. Set luminaire aside until baseinstallation is complete.4. Pull field wires, including ground wire through conduit.5. Assemble (3) 1/2” hex nuts and (3) washers to the (3)anchor bolts. (Figure 2.)6. Insert the base rubber pad onto the anchor bolts withexposed wire thru the middle.7. Insert the base driver assembly onto the anchor bolts,making sure the base driver assembly is sitting on thewashers.8. If driver assembly is not leveled, remove rubber baseplate, and make minor adjustment to the three hex nutsin order to level base driver assembly.9. Once driver assembly is leveled, insert base rubber padand driver assembly. Rotate base driver assembly tilldesired orientation.Figure 2.Figure 1.Split WasherFlat WasherElectrical BaseConcrete Base3/4” Conduit (2 Shown)Anchor BoltsBase Gasket1/2 Hex NutTemplateAnchor Bolts (3X)3/4”Conduit (2X)5.88 Max BoltProjectionExpose Atleast10” of Wire (2X)Lot ConduitProject 1.00”Max (2X)