Visible break and visible ground using BOL-TterminationsStep 1Clean and lubricate apparatusClean and lubricate interfaces of protective caps andstandoff bushings using lubricant supplied or Eatonequivalent.Step 2Install standoff bushingAttach a #14 AWG copper drain wire from the standoffbracket ground lug to system ground.Securely fasten a clampstick to the eyebolt on standoffbushing bracket and use the clampstick to position thestandoff in standoff pocket. Tighten eyebolt againstapparatus wall.Step 3Remove "C" connectorSecure loadbreak “C” (LCN) connector operating eye firmlyonto clampstick and lock.Thrust clampstick forward until the connector movesapproximately 1/4" (5 mm) further onto the bushings. Thisaction will break any surface friction between outer surfacesof bushings and inner surfaces of connector interfaces. Theyellow latch indicator rings on the bushings should now bevisible in the cuff windows of the connector.Looking away from the connector, pull the clampstick andwithdraw the connector from bushings with a fast, firm,straight motion. Minimum amount of travel of connector tobreak load is 9" (230 mm). See Figure 18.Using the clampstick, move the connector away fromthe bushings and place the metallic portion of one of theprobes directly onto a ground plane. This will discharge anycapacitive charge that may still be on the probes.Install “C” connector on Cleer standoff bushing.Step 4Install insulated protective capAttach Cleer loadbreak protective cap drain wire to systemground.Using a clampstick, install a Cleer 600 A loadbreakprotective cap on the source-side loadbreak bushing. SeeFigure 19.Figure 18. Remove "C" (LCN) connector.REMOVE LCNBOL-TTERMINATIONBOL-TTERMINATIONLOADSOURCEFigure 19. Install Cleer 600 A loadbreak protective cap.CLEER 600 ALOADBREAKPROTECTIVE CAPLOADSOURCEWARNINGVisibly inspect grounding elbows, cables, ferrules, andclamps prior to installation to ensure they are complete,undamaged, and there is no corrosion or breakage.Damaged or worn grounding equipment can result inequipment failure that could cause property destructionor personal injury.WARNINGAll associated apparatus must be de-energized duringinstallation or maintenance.10CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS MN650019EN March 2016