Equipment required600 A Cleer loadbreak connector includes:• Molded rubber connector (LCN)• (2) 2-position 600 A loadbreak/deadbreak junctions withstainless steel bracket• Mounting feet hardware kit• Silicone lubricant• Installation instruction sheetTools/Accessories needed:• 1/2" wrench for mounting feet hardware (customer supplied)• 1/2" mounting surface hardware (customer supplied)• 3/4" wrench for mounting surface hardware (customer supplied)In-line bracket instructionsStep 1Using supplied 5/16" hardware, loosely attach pivot support/mounting feet assembly to each side of mounting bracket.See Figure 6.ote:N Refer to mounting configurations and dimensions onpage 12, Figure 22.Step 2Place assembly against the mounting surface.Adjust the brackets for proper alignment and mark theirlocation on the mounting surface. See Figure 7.Step 3After mounting location has been marked, detach pivotsupport/mounting feet assembly from bracket. Using 1/2"hardware (customer supplied), mount pivot support/mount-ing feet assembly on mounting surface according to locationmarks made in Step 2.Step 4With pivot support/mounting feet assembly secure, usingsupplied 5/16" hardware, mount bracket with junction topivot support/mounting feet.Step 5Adjust bracket to desired angle. Tighten all bolts securely.See Figure 8.Figure 8. Bracket angle adjustment.Figure 7. Adjust bracket and mark location.ADJUST FOR PROPER ALIGNMENT AND MARK LOCATIONMOUNTINGSURFACEFigure 6. Attach pivot support/mounting feet assemblyto bracket.PIVOT SUPPORT/MOUNTING FEETASSEMBLYInstallation instructionsCAUTIONEaton's 600 A loadbreak connector is designed to beoperated in accordance with normal safe operatingprocedures. These instructions are not intended tosupersede or replace existing safety and operatingprocedures. Terminators must be de-energized duringinstallation and maintenance. Visible break andadequate grounding must be provided before cablework proceeds. (Ensure that the connector is rated forthe intended application before it is installed.)The loadbreak connector should be installed and servicedonly by personnel familiar with good safety practice andthe handling of high-voltage electrical equipment.3CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS MN650019EN March 2016